- Voltage and Current Accuracy - 0.02%rdg + 0.02%rng
- 45-65Hz Phase Accuracy - 0.003deg
- UKAS ISO17025 - All accuracies certified to ISO17025
- 45-65Hz Power Accuracy (Watts) [Total % error, PF 1~ 0.5] - 0.15%
- 45-65Hz Power Accuracy (Watts) [Total % error, PF 0.5 ~ 0.05] - 0.23%
- 45-65Hz Power Accuracy (Watts) [Total % error, PF 0.05 ~ 0.02] - 0.52%
- 45-65Hz Power Accuracy (Watts) [Total % error, PF 0.02 ~ 0.01] - 0.55%
- Measurement Bandwidth - DC, 10mHz ~ 2MHz
- Communication Ports - RS232, LAN, GPIB or USB
- Warranty - 3 Years
The World’s Most Accurate Power Transformer Analyzer.
The PPA5500-TE is a high accuracy transformer power analyzer, dedicated to the transformer industry. Its exceptional performance is a result of a meticulous development program by the N4L team who have years of experience working with the transformer industry. Transformer analysis requires very specific performance specifications including exceptional phase angle accuracy and repeatability. The PPA5500-TE provides market leading low-power factor analysis, supplied with UKAS ISO17025 certification.
Maintaining all the features, functions and ease of use for which the PPA5500 series has become known, the PPA5500-TE combines the inherent phase accuracy of PPA analyzers with a calibration process that is optimised specifically for low power factor applications. Here we look at total, fundamental and phase measurements on one of three phases while measuring a PF 0.01 signal.
| Specification Highlights | |
|---|---|
| Voltage and Current Accuracy | 0.02%rdg + 0.02%rng |
| 45-65Hz Phase Accuracy | 0.003deg |
| UKAS ISO17025 | All accuracies certified to ISO17025 |
45-65Hz Power Accuracy (Watts) | 0.15% |
45-65Hz Power Accuracy (Watts) | 0.23% |
45-65Hz Power Accuracy (Watts) | 0.52% |
45-65Hz Power Accuracy (Watts) | 0.55% |
| Measurement Bandwidth | DC, 10mHz ~ 2MHz |
| Communication Ports | RS232, LAN, GPIB or USB |
| Warranty | 3 Years |
Featuring the industry renowned planar shunt technology (A shunt design topology developed by N4L) and FPGA based real time no gap analysis techniques, the PPA5500 is able to provide ground breaking low-power factor analysis performance. Every PPA5500-TE is supplied with a comprehensive UKAS ISO17025 certificate, featuring power calibration at a range of power factors from unity to 0.01, calibration is performed at N4L in the UK in our accredited ISO17025 Laboratory.
Testimonial
“The main reason I selected the N4L Power Analyser was because we required an instrument with the ability to be accurate at very low power factors. The N4L analysers are one of the few that meet this criteria. Other factors which made us look at the N4L products are that they are competitively priced and the turnaround time for full calibration is normally a week. Since our equipment is in virtually constant use this is very important to us. After sales service is extremely good and they actually listen to what you say and if possible will adapt hardware and software to meet your requirements. An additional benefit is that the software is easy to use and allows you to select what to measure, how to display it and record it in a format that is easily usable. Overall, as an instrument of this calibre, it is easy to use, and has a secondary use as a highly accurate multimeter.”
Ross Smirthwaite, Senior Test Engineer, GE Grid Solutions
View product on Newtons4th website
Datasheet
We're here to help
Talk to an expert today.
Our friendly team of highly trained specialists will quickly assist you.
We promise to respond within 4 business hours (AEST).
Or you will receive $100 off your next purchase. Read how it works.
Our Experience
We offer you advice that is gained from many years of assisting people from all industries with their individual requirements, technical objectives and challenges.
most advanced solutions
The Ametek stable of brands the are industry's greatest innovators, always being the first to release new technologies & features.
Satisfaction guarantee
We work hard to ensure that you are very happy with every aspect your new test equipment solution and provide the most attentive after-sales care in the industry.
Top FAQs
Electrostatic discharge (ESD) is the sudden flow of electricity between two electrically charged objects caused by contact, an electrical short, or dielectric breakdown. A buildup of static electricity can be caused by turbocharging or by electrostatic induction.
Simulates electrostatic discharge events directly to the product, or to a nearby conductive surface.
Test Method
The ESD test requires that discharges be made to all exposed surfaces of the EUT, including connector back shells. Contact discharge is to the conducting surfaces of the product and air gap discharges are to non-conducting surfaces. The test also requires that contact discharges be made to a horizontal reference plane and vertical reference plane at locations 10cm from the front, rear and sides of the EUT. The ESD Simulators/Generators/Guns can be used for ESD Testing.
Typical rise time of the ESD pulse waveform is approximately 0.7 - 1nS with a hold time of 30 - 60 nS. (See image)

The test simulates ESD events that occur when the user touches the equipment under test or nearby metallic objects (e.g. filing cabinets). The test levels for both the heavy industrial and light industrial/commercial/residential standards are ±2kV and ±4kV for the contact discharge method and ±2kV, ±4kV, and ±8kV for the air gap discharge method.
A transient event is a short-lived burst of energy in a system caused by a sudden change of state. The source of the transient energy may be an internal event or a nearby event. The energy then couples to other parts of the system, typically appearing as a short burst of oscillation.
In electrical and electronic engineering such electromagnetic pulses (EMP) occur internally as the result of the operation of switching devices. Engineers use voltage regulators and surge protectors to prevent transients in electricity from affecting delicate equipment. External sources include lightning (LEMP), electrostatic discharge (ESD) and nuclear EMP (NEMP).
Within Electromagnetic compatibility testing, transients are deliberately administered to electronic equipment for testing their performance and resilience to transient interference. Many such tests administer the induced fast transient oscillation directly, in the form of a damped sine wave, rather than attempt to reproduce the original source. International standards define the magnitude and methods used to apply them.
Simulates high frequency electrical disturbance on power and signal lines due to the switching of inductive loads on the AC line.
Test Method
The test waveform consists of a 15ms burst of pulses at 300ms intervals. The pulses have a rise time of 5ns and a dwell time of 50ns, with a repetition rate of 5 kHz.
For heavy industrial equipment the test levels are:
- AC lines; ±2kV
- DC lines;
- ±2kV Signal lines on cables that could be longer than 3m; ±1kV
- Process control lines and measurement lines; ±2kV
Noise is directly injected onto power lines through a capacitor and capacitive coupled onto I/O lines using a coupling trench. DC power ports connected to an AC-DC power adapter are not tested.
Surges, or transients, are brief overvoltage spikes or disturbances on a power waveform that can damage, degrade, or destroy electronic equipment within any home, commercial building, industrial, or manufacturing facility. Transients can reach amplitudes of tens of thousands of volts.
Simulates low frequency, high-energy electrical transients on power lines and long distance I/O lines (such as telephone lines) coupled from nearby lightning strikes.
Test Method
Test is applied to AC and DC power ports. The open circuit signal wave-shape has as 1.2µs rise time and 50µs hold time. Surges are applied in common mode (line-to-ground) and in differential mode (line-to-line). All surges are synchronized to the 0°, 90°, 180° and 270° phase angles of the AC voltage. DC power ports are not tested if they are connected to an AC-DC power adapter, in which case the AC-DC adapter should be submitted for testing.
Test levels for the residential, commercial and light industrial generic standard are 2kV common mode and 1kV differential mode on AC power lines. For DC power lines, the test levels are 0.5kV for both differential and common mode. Although the test is not currently required for the heavy industrial generic standard, it suggests test levels of 4kV common mode and 2kV differential mode.
Simulates brown outs and blackouts on AC power lines.
Test Method
This test is applied to AC power ports rated at less than 16 amps per phase. All voltage shifts are synchronized to the zero crossing of the AC voltage.
Typical test levels for the generic light industrial standard involve a 30 percent dip in the line voltage for 10ms, 60 percent dip for 100ms and dropout for 5000ms. There are currently no requirements for Heavy Industrial equipment.
All linear amplifier systems, when given a sufficiently strong input signal, will reach a point where the system departs from a linear relationship between input and output. At this point the system is said to be going into compression or beginning to saturate. Beyond this point, the linear relationship between input and output is no longer valid and the amplifier is no longer considered to be linear. An internationally recognised figure of merit, used for defining the extent of linearity of an amplifier, is the 1dB compression point. This is the point of –1dB departure from linearity. The output power of an amplifier cannot increase indefinitely and when an increase in input power generates no discernible increase in output power, the amplifier is said to be saturated, and by definition the output is not proportional to the input signal. This point is often referred to as Psat on a datasheet or sometimes P3dB. Generally, saturated power is of importance when considering the pulsed power requirements in something like automotive testing while linear power is of importance when considering the AM (amplitude modulation) waveform used in commercial EMC testing.
Thank you for helping our team select the correct product to facilitate testing to the various required standards. Our lab is now equipped with a range of Teseq, IFI and Milmega products and the entire solution fulfils our testing requirements. We really appreciate your technical advice & support.
Scott Emerson
EMC TEST ENGINEER
Aside from receiving information when we need to upgrade or purchase an item of test equipment, what we really need from an equipment partner is advice based on industry experience. Thank you for the many hours spent talking to us and answering our questions. This level of customer care is rare in this industry.
Janet Boyle
EMC TEST ENGINEER TEAM LEADER
The Teseq GTEM is a great testing tool to have. We are now performing all pre-compliance testing in-house and saving lots of money which we were spending earlier with test labs. It has given us significant more testing capability and flexibility. Thank you for your help.
Sue Benton
TECHNICAL DIRECTOR
Technical Support
Our experts are all pre-eminent leaders in electrical products who provide excellent support in their areas of expertise.
Technical supportTalk to an expert
Our friendly team are highly trained product experts who really enjoy helping customers find what they need.
call 1300 387 326Enquire by email
We promise to respond within 4 business hours (AEST) or you will receive $100 off your next purchase.
Enquire now